Jefferson County Planning Commission
Hybrid Hearing Meeting
AGENDA

-
Hearing Room 1 / Virtual Hearing via WebEx Webinars
100 Jefferson County Pkwy
Golden, CO 80419

Instructions for Public Comment/Public Testimony for Virtual Hearings via WebEx Webinars:

If a citizen wishes to make public comment or provide public testimony virtually during the hearing, they will be required to log into the meeting using a computer. (Note: Public Comment is not taken during the Pre-Meeting.)

 

When you log into the online event, please send a Chat message to the Host (staff), if you wish to provide general comments or comments related to a specific case on the agenda. Please provide your first and last name, address, and the topic of your comment or case number, and you will receive confirmation once you have been added to the list.  

 

During the designated time for public comment or public testimony on a specific case, your name will be called in the order it was received. Your microphone will be unmuted once your name has been called. You will have three minutes to provide your testimony, or ten minutes if you represent a Registered Association.

 

If you plan on testifying at the hearing, please pre-register online or contact the case manager listed on the agenda so we can be sure your voice is heard. If you want to present documents, images or a presentation to the Planning Commission, please send the files to the case manager prior to the hearing (24 hours at the latest) so we can ensure these documents are able to be presented during the hearing.

 

Event links can be found below or here: https://www.jeffco.us/meetings

 

 

Pre-Meeting: Faye Griffin Room / Webex Webinars (5:30 p.m. - 6:00 p.m.)
Pre-Meeting Connection Details (No Public Comment is taken):
https://jeffco.webex.com/jeffco/j.php?MTID=m63636a43e776621c151433925a8f5a93
Access Information - Webinar Number: 2491 394 0081
Webinar Password: Aqqzgcz4Y35 (27794294 from phones)
Audio Connection: (720) 650-7664 Access Code: 2491 394 0081

Agenda Items:

  1. Director/Assistant Director of Planning and Zoning
  2. Planning and/or Engineering Manager/Supervisor
  3. Other Staff
  4. Legal Counsel
  5. Administrative Assistant
  6. Case Review

 

Hearing: Hearing Room 1 / Webex Webinars (Approximately 6:15 p.m.)
Hearing Connection Details:
Join the WebEx webinar from here:
https://jeffco.webex.com/jeffco/j.php?MTID=m9658f3726c7bf87bbe34a0110b57dedc
Access Information - Webinar Number: 2491 054 7049
Webinar Password: nsBJmPAT378 (67256728 from phones)
Audio Connection: (720) 650-7664 Access Code: 2491 054 7049


A short period for members of the public to appear without being scheduled ahead of time to make comments on planning matters not before the Commission at this time.

Location and Extent
Case Name: Kings Valley Transmission Line Project
Owner/Applicant: Core Electric Cooperative
Location: Immediately north and south of US Highway 285 from approximately mile marker 232 to mile marker 233
Approximate Area: 7.09 Acres
Purpose: To construct new transmission lines and relocate existing transmission lines underground
Case Manager: Reid Powers

Location and Extent
Case Name: Jefferson Academy Charter School – 99th
Owner/Applicant: Jefferson Academy, A Colorado non-profit corporation
Location: 7777 W 99th Avenue, Westminster
Section 14, Township 2 South, Range 69 West
Approximate Area: 2.13 Acres
Purpose: To convert an existing structure into additional classroom space for the Jefferson Academy Elementary School
Case Manager: Reid Powers

Preliminary and Final Plat
Case Name: Rogers Street Subdivision
Owner/Applicant: 1105 Rogers LLC, a Colorado limited liability company
Location: 1105 Rogers Street, Golden
Section 2, Township 4 South, Range 70 West
Approximate Area: 1.1995 Acres
Purpose: To subdivide the property into 14 lots for single-family detached units
Case Manager: Ben Johnson